YUC
Send InquiryWhatsApp
Tech forges quality, Yuchuang for the world

G4W50 Four-Head Horizontal Bending Center

Equipment Applications This CNC horizontal rebar bending center is primarily used in national infrastructure projects such as railways, highways, bridges, tunnels, and underground pipeline corridors. It is particularly well-suited for bending rebar in box girders and cap beams. The equipment primarily consists of a conveyor roller, a lifting mechanism, a left bending head, a right bending head, a gripper, a discharge mechanism, a material receiving trolley, an electronic control system, and a p…

Since 1996

Manufacturer in Changge City

20,000 m²

Factory, 150+ employees

ISO9001

SGS / TUV inspected, CE certified

24h online

Pre-sale and after-sale support

G4W50 Four-Head Horizontal Bending Center Description

Technical parameters
model
Processing steel bar diameter Φ 12-50mm
Rated bending speed 38.4°/s
Bending machine moving speed 0.5-0.9m/s
  bending angle Positive bend 0-180°
Reverse bend 0-120°
Installed power 24Kw
Maximum conveyor roller load-bearing capacity 1000Kg
Minimum center distance of bending head 1200mm
Maximum center distance of bending machine head 13000mm
Equipment dimensions 12.5mx2.5mx1. 5m
Equipment weight About 7 tons
Operation Procedure Before installing this equipment, a reinforced concrete foundation must be cast. The cement concrete foundation must comply with national equipment foundation specifications. Power and signal cables, etc., must be routed through the pre-buried conduit. The production line layout is primarily divided into three areas: the rebar raw material storage area, the rebar bending machine head operating area, and the storage and processing of finished products. Transportation and subsequent processing must be streamlined. During commissioning, to ensure safety, only the commissioning personnel may operate electrical switches and buttons. No one else is permitted to operate these switches or buttons. (1) Before commissioning ① First, check the fasteners and connectors of each part to ensure that there is no looseness; ② Check the lubrication of each lubricated part and the oil level of the reducer and air compressor; (2) No-load test Let the motor and transmission part work and run at no-load for at least 5 minutes. During no-load operation, pay attention to 1. Check the direction of rotation of the motor; 2. Check the action of the cylinder; 3. Check the photoelectric detection signal; 4. Check whether the steel bar clamps are moving in unison; 5. Check whether the smooth operation of all movements of the entire machine is normal; 6. After stopping the machine, change the speed and then perform a test run according to 1-5 above. (3) Test run with load. ① Perform a manual test run; ② Perform an automatic test run. ③ After the automatic test run is normal, train the personnel and the machine can be put into use after the training is completed.

Related Products

How We Work With You

  1. 1Solution Development
  2. 2Manufacturing and commissioning
  3. 3Operational Production
  4. 4Business Negotiation

Questions before you decide? See the FAQ.

Get in Touch