YUC
Send InquiryWhatsApp
Tech forges quality, Yuchuang for the world

YUC Positioning Network Welding Platform

This equipment uses resistance welding technology and is equipped with a horizontal and bidirectional (longitudinal) mobile workbench, which solves the disadvantage of gantry mesh welding machines that can only weld in one direction and not diagonally. The equipment is equipped with manual, semi-automatic, and fully automatic processing modes to ensure high-efficiency mesh welding. The equipment uses coordinate positioning technology, which has precise positioning, short heating time and concen…

Since 1996

Manufacturer in Changge City

20,000 m²

Factory, 150+ employees

ISO9001

SGS / TUV inspected, CE certified

24h online

Pre-sale and after-sale support

YUC Positioning Network Welding Platform Description

model WH1200
Servo motor 3x 1kw
Circuit requirements Dedicated line 400A circuit breaker 2 core copper core main line> 50 square
Host size 12000x2500x1800mm
Motor total power 150KW
Total equipment weight 4000kg
  • 1. Power Supply: Confirm that the main unit is connected to a power source and turn on the power switch. 2. Preparation: Check the machine status and safety devices. 3. Parameter Setting: Adjust the welding speed and current as needed. 4. Loading Wire: Place the rebar wire into the machine's wire clamp. 5. Positioning Rebar: Place the rebar to be welded within the weld mesh as required. 6. Starting the Machine: Press the start button to begin the automatic welding process. 7. Weld Point Inspection: Check the weld quality and strength to ensure they meet the requirements. 8. Shutting Down the Machine: After welding is complete, shut down the machine for cleaning and maintenance.

Related Products

How We Work With You

  1. 1Solution Development
  2. 2Manufacturing and commissioning
  3. 3Operational Production
  4. 4Business Negotiation

Questions before you decide? See the FAQ.

Get in Touch